| VERSION | CHANGE | | 07.27.10 | Original version | | 08.07.10 | Page 6 - On the Acorns chart, the red-bordered pattern repeat beginning at row 11 and ending at row 22 is now a 10-stitch pattern repeat. It begins at stitch 4 (not stitch 3, as in the previous version) and ends at stitch 14. | | 08.27.10 | Page 3 - On the schematic, the measurements for the neck opening are for the width (shown as a straight line), not the circumference (shown as an open circle with arrows at the ends). Additionally, the last metric measurement for the neck opening should be 31.5 cm, not 21.5 cm. Page 4 - Under Abbreviations, the first line of M1R should begin with “Make 1 Right....” and the first line of M1R-p should begin with “Make 1 Right purlwise....”. | | 09.01.10 | Page 1 - Under Notions, the number of buttons needed has been changed to 7. |
|
|
| VERSION | CHANGE | | 07.27.10 | Original version | | 08.23.10 | Page 2 - Line 40 of the chart should read: "K3tog, p1, ssk". Under Abbreviations, k3tog is defined as "knit 3 stitches together". |
|
| VERSION | CHANGE | | 07.27.10 | Original version | | 08.23.10 | Page 1 - The yarn requirements are now "4 (4, 4, 5, 6) skeins Miss Babs Yowza...." | | 12.20.10 | Page 4 - M1P has been added to Abbreviations on the right side of the page and should be defined as: "Make 1 Purl: Insert left needle, from front to back, under strand of yarn which runs between next stitch on left needle and last stitch on right needle; purl this stitch through back loop. 1 stitch increased." |
|
| VERSION | CHANGE | | 07.27.10 | Original version | | 09.13.10 | Page 2 - The cable symbols in the last column of the chart key have been revised. From the top, they are: C2B, C4B, C4F.
|
|
| VERSION | CHANGE | | 07.27.10 | Original version | | 08.12.10 | Page 6 - In the first column under Right Front, the second paragraph should read: Row 1 (RS): P2, [k2, p3] to end. Row 2: [K3, p2] to last 2 sts, k2. |
|
|
|
|
|
|
|
Page 1 of 3 |